Catalog NewsArticlesDealersDeliveryServiceJobPartnership
Enerpred

Equipment for trenchless pipe-laying (UG100T)

UG100T designed for trenchless laying of various types of underground utilities (water, sewer, electric cable, etc..) By a puncture in the soil category I-III under highways, tramway, railway embankments, marshy soils, forests, etc. followed by pulling cable, HDPE pipe or metal.Includes tip. Additionally, the installation is completed expanders with hooks and rods. By request of the customer of their characteristics (depending on the diameter of the pipe and pushes soil properties) and the number may vary.

Models
Model with your options
Drawing
Model Capacity t Tension
capacity
ton
Stroke mm Rated
pressure
Bar
Length
of
the
bursting
m
Soil Dimensionsmm (BxLxH) Weight kg
UG100Т 100 50 1100 70 до 50 I-III 500×2360×660 750
Model
UG100Т
Capacity t Tension
capacity
ton
Stroke mm Rated
pressure
Bar
100 50 1100 70
Length
of
the
bursting
m
Soil Dimensionsmm (BxLxH) Weight kg
до 50 I-III 500×2360×660 750
Model UG100Т Capacity t 100 Tension
capacity
ton
50 Stroke mm 1100 Rated
pressure
Bar
70 Length
of
the
bursting
m
до 50 Soil I-III Dimensionsmm (BxLxH) 500×2360×660 Weight kg 750
Диаметр, мм Масса, кг
Наконечник 60 2,1
Штанга (длина 1 м) 48 14
Расширители 130 8,5
180 13,2
270 33
Зацеп (труба D110 мм) 120 14
Зацеп (труба D160 мм) 170 23

Этапы и порядок работ по прокладке коммуникаций

Рекомендуемые станции Цикл прокола (прямой ход/возврат) 1 метра насыпи*
с бензоприводом
НБР-2,4И40-1 7 мин. / 3 мин. 30 сек.
НБР-5,0И40-1 3 мин. 30 сек. / 1 мин. 40 сек.
НБР-10,0И100-1 1 мин. 45 сек. / 50 сек.
с электроприводом
НЭР-2,8И40Т1 6 мин. 10 сек. / 3 мин.
НЭР-5,0И40Т1 3 мин. 30 сек. / 1 мин. 40 сек.
НЭР-10,0И40Т1 1 мин. 45 сек. / 50 сек.

* Расчётное время не включает в себя подготовительные и заключительные работы, замену штанг.

Specify the appropriate parameters
Comment to the order
Сontact details
V.V. Schelerov Начальник восстановительного поезда

When moving on turnouts there are no problems with the passage of crosses and counter rails, and also maintains the speed of rolling out the rolling stock set for it. The TTL-25 trolley manufactured by your company is a good example of equipment for emergency repairs on railways.

Reviews

We successfully cooperate

We have much to be proud of, because of our
partners leading companies in Russia and Eastern Europe:

Order a call

Our contacts

Irkutsk

Главный офис

address

Rosa Luxemburg street, 184,post office box 129
Irkutsk, 664040, Russia

Phone

(3952) 211-140

Fax

(3952) 555-159

Email for orders

zakaz@enerpred.com

Email

info@enerpred.com

Moscow

Филиал

address

1-st Mitinskiy per., 15, building 1.
Moscow, 125430, Russia

Phone

(495) 280-73-58

Email

sales@enerpred.com

Contact with manager

Select your region

priceRequest